EasyManua.ls Logo

Hi-Target V60 - Receiver Reset; Receiver Formatting

Hi-Target V60
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. New project
After new project is built before the measurement, the collected data will be saved in the project.
When building new project, relevant setting needs to be conducted, for example, setting of project
information, and coordinate system, etc..
Specific procedures as follows:
(1) Open the software Hi-Survey;
(2) Click "Project Info";( As shown in Fig. 3-2)
3. Hi-Survey
3.1 Setting
38
Hi-Survey
Single-click "Hi-Survey" to open it
Fig.3-1

Other manuals for Hi-Target V60

Related product manuals