EasyManua.ls Logo

HIKVISION DS-3E03 P Series

HIKVISION DS-3E03 P Series
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16/24-Port 100M Long-Range PoE Switch Quick Start Guide
7
Figure 2-2 Fix Switch to Rack
Do not place any heavy object on the switch in case of any incident.
Make sure sound cooling and ventilation.
2.4 Grounding
Purpose:
Grounding is used to quickly release overvoltage and overcurrent induced by lightening for switch,
and to protect personal safety. Select the appropriate grounding method according to your needs.
2.4.1 With Grounding Bar
If a grounding bar is available at the installation site, follow the steps below.
Step 1 Connect one end of the grounding cable to the binding post on the grounding bar.
Step 2 Connect the other end of the grounding cable to the switch grounding terminal and fix the
screw.

Related product manuals