4
Installation MACH 1000
Release
04
12/2015
2.2.1 Connecting the voltage supply terminals (power
supply units “C” and “G”) 40
2.2.2 Connecting the plugged voltage supply (power
supply units “L” and “M”) 43
2.2.3 Connecting the signal contact 45
2.3 Installing and grounding the device 46
2.3.1 Mounting in a switch cabinet 46
2.3.2 Vertical mounting on the wall 48
2.3.3 Grounding the device 49
2.4 Operating the device 49
2.5 Connecting data cables 49
2.5.1 Twisted Pair ports 49
2.5.2 Optical fiber ports 49
2.6 Installing an SFP transceiver (optional) 50
3 Making basic settings 51
4 Monitoring the ambient air temperature 52
5 Maintenance and service 53
6Disassembly 54
6.1 Removing the device 54
6.2 Removing an SFP transceiver (optional) 54
7 Technical data 55
A Further Support 67