EasyManua.ls Logo

Hitachi CH-Box - 4 Box Installation; Factory-Supplied Accessories

Hitachi CH-Box
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P5417025-rev.1
7
4. CH-Box Installation
● Do not install the CH-Box in a ammable
environment to avoid re or an explosion.
4.1 Factory-SuppliedAccessories
Checktoensurethatthefollowingaccessoriesare
packedwiththeCH-Box.
Table4.1Factory-SuppliedAccessories
NOTE
Check to ensure that the ceiling slab is strong
enough.
Do not install the CH-Box outdoors.
If installed outdoors, an electric hazard or
electric leakage may occur.
Installation WARNING: Ensure that all safety
features, disconnects and interlocks are
in place and functioning properly prior to
putting the equipment into operation. Never
by-pass or jump-out any safety device or
switch.
Ifanyoftheseaccessoriesarenotpackedwiththe
unit,pleasecontactyourdistributor.
Unit:mm(inch)
No. Accessory
CH-AP04MSSX
JCH-AP04MSSX
Q’ty
CH-AP08MSSX
JCH-AP08MSSX
Q’ty
CH-AP12MSSX
JCH-AP12MSSX
Q’ty
CH-AP16MSSX
JCH-AP16MSSX
Q’ty
(1)
Accessory
Pipe
ID
f
12.7(1/2)
Flaring
f
15.88(5/8)
4 8 12 16
(2)
ID
f
6.35(1/4)
Flaring
f
9.52(3/8)
4 8 12 16
(3)
ID
f
19.05(3/4)
Flaring
f
15.88(5/8)
Flare Nut
2
Flare Nut
2
Flare Nut
2
Flare Nut
2
(4)
ID
f
22.2(7/8)
Flaring
f
15.88(5/8)
Flare Nut
1
Flare Nut
2
Flare Nut
2
Flare Nut
2
(5)
Insulation
Material
ID
f
26
(1)
4 8 12 16
(6)
ID
f
35
(1-3/8)
4 8 12 16
(7) Clamp
17 34 51 68

Related product manuals