EasyManua.ls Logo

Hitachi CH-Box - Page 27

Hitachi CH-Box
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P5417025-rev.1
17
(b) IndoorUnitSideFieldPipingSize
●WhenabranchislocateddownstreamoftheCH-Box
●WhenabranchisnotlocateddownstreamoftheCH-Box
ConnectedIndoorUnit
Capacity:(Q)
GasPipe(D) LiquidPipe(E)
kW mm (inch) mm (inch)
Q < 16.0
f
15.88 (5/8)
1
f
9.52 (3/8)
1
Q = 16.0
f
19.05 (3/4)
f
9.52 (3/8)
1
1.Fieldaringworkisrequired.RefertoSection5.1forthearingwork.
ConnectedIndoorUnit
Capacity:(Q)
GasPipe(D) LiquidPipe(E)
Remarks
kW mm (inch) mm (inch)
Q≤6.3
f
12.7 (1/2)
f
6.35 (1/4)
Useaccessorypipe(1)ongaspipeside
andaccessorypipe(2)onliquidpipesideto
decreasethepipesize.
7.1≤Q≤16.0
f
15.88 (5/8)
1
f
9.52 (3/8)
1
-
Q = 22.4
f
19.05 (3/4)
f
9.52 (3/8)
1
Useaccessorypipe(3)ongaspipesideto
increasethepipesize.
Q = 28.0
f
22.2 (7/8)
f
9.52 (3/8)
1
Useaccessorypipe(4)ongaspipesideto
increasethepipesize.
1.Fieldaringworkisrequired.RefertoSection5.1forthearingwork.
NOTES:
1. WhenconnectingtheGasPipe(D)andLiquidPipe(E),reusethearenutattachedtothe
CH-Box.
2. Whentheconnectedindoorunitcapacityis6.3kWorlessandthepipinglengthexceeds15m(49ft.),
use9.52mm(3/8inch)fortheliquidpipe.
In case the piping connection is not used for the indoor unit side piping connection, it must be
sealed using the closed are nut originally attached. These are nuts have been tightened by
torque specications shown below before shipping. Ensure that they are sealed completely.
NOTICE

Related product manuals