36
 3. Management with Web browser software 
 3.4 Event Scheduling 
 The scheduling function enables to setup scheduled events including power on / 
power off. It enables to be “self-management” projector.  
 • You can schedule the following control events: Power ON/OFF, Input 
Source and Transferred Image Display. 
  • The power on / off event has the lowest priority among the all events that are 
defi ned at the same time. 
  • There are 3 types of Scheduling, 1) daily 2) weekly 3) specifi c date. ( 
  21 )
  • The priority for scheduled events is as follows 1) specifi c date 2) weekly 3) 
daily.
  • Up to fi ve specifi c dates are available for scheduled events. Priority is given to 
those with the lower numbers when more than one event has been scheduled 
for the same date and time (e.g., ‘Specifi c date No. 1’ has priority over ‘Specifi c 
date No. 2’ and so on. 
  • Be sure to set the date and time before enabling scheduled events. (