EasyManua.ls Logo

Hitachi RAS-2WHVRP - Transportation and Handling; Before Operation

Hitachi RAS-2WHVRP
154 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
Start-up and Operation: 

Maintenance: 

Maximum allowable pressure and high pressure cut-out value:
Refrigerant Maximun allowable pressure (MPa) High pressure switch cut-out value (MPa)
R32  
? NOTE
The label for the vessel under PED are attached on the high pressure
vessel. The pressure vessel capacity and vessel category are indicated
on the vessel.
Location of High Pressure Switch

? NOTE
The high pressure switch is indicated on the electrical wiring diagram in
the outdoor unit as HPS connected to printed circuit board (PCB1) in the
outdoor unit.
Structure of High Pressure Switch

Pressure detected

! DANGER
Do not change the high-pressure switch locally or change the high pressure cut-out set value locally. If changed, it will cause serious
injury or death due to explosion.
Do not attempt to turn service valve rod beyond its stop.
4 TRANSPORTATION AND HANDLING




Model Unit Gross Weight (kg)
RAS-(2/2.5)WHVRP 
RAS-3WHVRP 
1





5 BEFORE OPERATION
! CAUTION
Supply electrical power to the system for approximately 12 hours before start-up or a long shutdown. Do not start the system immediately after
power supply, it may cause a compressor failure because the compressor is not heated well.
When the system is started after a shutdown longer that approximately 3 months, it is recommended to check the system by your service contractor.
Turn OFF the main switch when the system is to be stopped for a long period of time: If the main switch is not turned OFF, electricity will be used,
because the oil heater is always energised during compressor stopping.
Make sure that the outdoor unit is not covered with snow or ice. If covered, remove it by using hot water (approximately 50°C). If the water
temperature is higher that 50°C, it will cause damage to plastic parts.

PMML0509 rev.0 - 02/2019
3

Table of Contents

Other manuals for Hitachi RAS-2WHVRP

Related product manuals