EasyManua.ls Logo

Hitachi RAS-4-HNCE - Place Provision

Hitachi RAS-4-HNCE
480 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Unit Installation
23
SMGB0079 rev.0 - 01/2013
2
2.6 Place provision
2.6.1  Place provision for RAS-(2-2.5)HVNP / RAS-3HVNC
1 Secure the outdoor unit with the anchor
1. Base of outdoor unit
2. Nut
3. Special washer (M12)
4. Anchor bolts
5. Filled mortar
6. Concrete
A. Max. 17 mm
1
2
3
4
5
6
A
Fix the outdoor unit to the anchor bolts by special washer of factory-supplied accessory.
2 When installing the outdoor unit x the unit by anchor bolts.Regarding the location of xing holes.
1. M10 Hole for anchor bolt (Ø12)
2. Pipe cover
3. Front side
1
2
3
Example of xing outdoor unit by anchor bolts.
1. Max. 17 mm (After cut “A”)
2. Concrete
3. Anchor bolt
B: Cut this portion when this type of anchor bolt is used. If not
done it will be difcult to remove the service cover
B
1
2
3
3 Provide an adequate drainage around the foundation. When installing the unit on a roof or a veranda drain water may
turn to ice in a cold morning. Therefore avoid draining in an area where people often use because it is slippery. In case
of installing such a place provide the additional drainage around the foundation.
1. Drain hole (30x80)
2. Drain hole (3-30x80)
(30x80)
(30x80)
76
339
147
(228)
4-R8
58
40
42
1
Drain hole
Position for drain
boss (optional)
1
Front side

Table of Contents

Related product manuals