EasyManua.ls Logo

Hitachi RAS-4-HNCE - Drain Piping

Hitachi RAS-4-HNCE
480 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Piping work and refrigerant charge
71
SMGB0079 rev.0 - 01/2013
3
3 Correct position of distributor (available also for quad installation)
This is the correct position:
G r e a t e r
than 0.5 m
Main pipe
Refrigerant direction
Up
Branch pipe
Main pipe
Refrigerant di-
rection
Down
This is wrong position.
Main pipe
Refrigerant direction
Branch pipe
Branch pipe
Refrigerant di-
rection
Branch pipe
Main pipe
4 Correct position of Triple Branch Pipe (Standard series only).
Install the header horizontally
Sample: Triple Branch pipe
Gas piping
Liquid piping
3.3.7  Connecting are adapter
Flare nut (accessories)
Pipe (accessories)
Indoor unit
Flare adapter (accessories)
Gas line
Pipe
(eld
supplield)
Liquid line
The piping sizes for indoor unit and outdoor unit are different. Attach the are adapter (accessories) at the indoor piping
union part.
Use the adequate are adapter as follows:
Indoor unit
Flare adapter
Gas pipe Liquid pipe
2.0 HP
Big size
(
15.8812.70)
-
2.5 HP
Big size
(
15.8812.70)
Small size
(9.526.35)

Table of Contents

Related product manuals