EasyManua.ls Logo

Hitachi RPC-6.0FSN2E - Page 84

Hitachi RPC-6.0FSN2E
429 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Unit installation
72
SMGB0077 rev.0 - 01/2013
C A U T I O N
In case that the thermistors supplied with the Dx-Interface are not long enough, please make sure that the length
extension is properly done avoiding the sensing distortion and that the joint is properly insulated to avoid any
electrical failure.
N O T E
When tting the thermistors, remember that they must be secured correctly by the special clamp, ensuring
the perfect contact between the pipe and thermistor. Cover it completely with insulation, like cork tape or pipe
insulation, depending on the location. Replace them if damaged during maintenance work.
Thermistor installation example
1 Liquid / gas pipe thermistor (factory supplied)
2 Thermistor holder (eld supplied)
3 Thermistor lead wire (eld supplied)
4 Insulation (eld supplied)
1
2
3
4
C A U T I O N
The thermistor must be installed properly in order to
avoid water onto the thermistor.
Typical installation location
A
Liquid pipe
thermistor
Must be installed in the coldest liquid line
point in the heat exchanger (prior the
distributor).
B
Gas pipe
thermistor
Must be installed as close as possible to
the heat exchanger refrigerant outlet.

Table of Contents

Other manuals for Hitachi RPC-6.0FSN2E

Related product manuals