Hitachi RPK - 4.3 Wiring diagrams for the KPI indoor units and complementary systems

Hitachi RPK
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RPK-2.0FSN2M terminal board connections
Part
1 Electrical box
2 Connector (CN13)
3 Remote control wiring
4 Terminal strip (TB2)
5 Cable secured with the tie
6 Hole for the electrical box
7 Operating line
8 Hole for gas pipe and wiring installation
9 Electricity supply line
10 Terminal strip (TB1)
RPK-(2.5-4.0)FSN2M terminal board connections
Part
1 Terminal strip (TB1)
2 Terminal strip (TB2)
3 Cable secured with the tie
4 Earthing screw
Test runs
C A U T I O N
Be careful during the test runs, as some of the safety functions remain disabled: the units operate for two hours
without switching off via the thermostat. The three-minute compressor protection is not enabled during the
test.
Secure the rubber bushes to the panel using adhesive when the outdoor unit ducts are not used.
The compressor remains at a standstill during forced stoppage.
4 Electrical wiring
130
SMGB0063 rev. 1 - 10/2010