EasyManua.ls Logo

Hitachi RPK - KPI Energy; Heat Recovery Unit; Accessories Supplied with the Unit; Unit Installation

Hitachi RPK
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.9 KPI energy / heat recovery unit
2.9.1 Accessories supplied with the unit
Check that the following accessories are supplied with the unit.
N O T E
Please contact your HITACHI distributor if any of the accessories has not been supplied with the unit.
Accessory Appearance Quantity Purpose
Duct adapter 4 For duct connection.
Set screw (M4 x 8) 24
Adapter gasket 4 For hose connection.
Anti-vibration rubber, nut,
washer and spring washer
4, 4, 4, 8 For unit installation.
2.9.2 Unit installation
Initial checks
KPI-(252-802)(E/H)2E energy / heat recovery unit
1. Unit inspection and maintenance access.
KPI-(1002-2002)(E/H) energy / heat recovery unit
1. Unit inspection and maintenance access.
2 Unit installation
61
SMGB0063 rev. 1 - 10/2010
2

Table of Contents

Related product manuals