EasyManua.ls Logo

Hitachi RWD-2.5RW1E-220S User Manual

Hitachi RWD-2.5RW1E-220S
560 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTRUCTION
MANUAL
YUTAKI S COMBI SERIES
INDOOR UNITS
MODELS
RWD-(2.0-6.0)(N/R)W1E-220S(-K)
INSTRUCTION MANUAL
MANUAL DE INSTRUCCIONES
BEDIENUNGSANLEITUNG
MANUEL D’UTILISATION
MANUALE DI ISTRUZIONI
MANUAL DE INSTRUÇÕES
BRUGSANVISNING
INSTALLATIEHANDLEIDING
INSTALLATIONSHANDBOK
ΕΓΧΕΙΡΊΔΙΟ ΟΔΗΓΙΏΝ
EN
ES
DE
FR
IT
PT
DA
NL
SV
EL
BG
CS
HU
LT
PL
RO
SK
UK
РЪКОВОДСТВО С УКАЗАНИЯ
NÁVOD K POUŽITÍ
HASZNÁLATI ÚTMUTATÓ
NAUDOJIMO VADOVAS
INSTRUKCJA OBSŁUGI
MANUAL DE INSTRUCȚIUNI
NÁVOD NA POUŽITIE
ПОСІБНИК З ЕКСПЛУАТАЦІЇ
PMML0573 rev.1 - 07/2021

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Hitachi RWD-2.5RW1E-220S and is the answer not in the manual?

Hitachi RWD-2.5RW1E-220S Specifications

General IconGeneral
BrandHitachi
ModelRWD-2.5RW1E-220S
CategoryHeat Pump
LanguageEnglish

Summary

SAFETY

2.2 ADDITIONAL INFORMATION ABOUT SAFETY

Essential safety guidelines and precautions for unit operation and installation.

ELECTRICAL AND CONTROL SETTINGS

5.1 GENERAL CHECK

Ensures power supply, EMC compliance, and impedance requirements are met.

5.2 SYSTEM WIRING DIAGRAM

Illustrates electrical connections between indoor, outdoor units, and the operating line.

5.3 WIRING SIZE AND MINIMUM REQUIREMENTS OF THE PROTECTION DEVICES

Specifies cable sizes, protection devices (CB, ELB), and their ratings for unit installation.

5.6 SETTING OF DIP SWITCHES AND RSW SWITCHES

Explains DIP switch and rotary switch functions and settings for unit configuration.

UNIT INSTALLATION

6.3 INSTALLATION OF INDOOR UNIT

Step-by-step procedure for installing the indoor unit, including piping and wiring.

6.3.5 Power and transmission wiring connection

Guidance on connecting power supply and transmission wiring, including safety precautions.

COMISSIONING

7.1 BEFORE OPERATION

Pre-operation checks and recommendations, including supply power duration.

7.2 PRELIMINARY CHECK

Methodical checks after installation before system handover to the customer.

7.2.2 Electrical checking

Verifies electrical resistance, leakage, voltage, and component compliance with standards.

7.2.3 Hydraulic circuit checking (space heating and DHW)

Checks for correct flushing, filling, pressure, and absence of leaks in water circuits.

Related product manuals