●[Instruction Manual] Supplementary items 5
[Instruction Manual] Supplementary items
Storage
temperature
1067K, 1069K, 1072K,
2086K, 1087K, 1092F,
1095B, 1106K, 3112K,
1113K, 1114K
- 1117K
0 to 35°C 21 days 14 days 10 days
35 to 40°C 14 days 7 days 7 days
40 to 45°C 7 days 7 days 5 days
5. [Instruction Manual] Supplementary items of “1. Usage precautions
1.2 IJ printer long-term shutdown”
In the case where the operation of the IJ printer is irregular (the IJ printer is shut down for a few weeks in a row, for
instance) in conjunction with production and so on, there is a possibility of occurrence of a problem such as no ink
ejecting when operating the printer or no recovery possible due to accretion of the ink inside the printer.
The period of possible shutdown is different according to the temperature of the storage as described in the table
below. When you are to use the printer in such a manner, it is necessary to operate it (eject the ink) regularly within
an estimated period of possible shutdown or perform storage work for the long-term shutdown.
(The storage work for the long-term shutdown is to drain the ink in the ink circulation system and refill it with the
makeup, which requires a specific operation on a restart. Refer to Technical manual "6.16 Long-term shutdown" for
detail.
Moreover, in the case of operating it regularly, note that the time necessary for operating it once is different
according to the ink to be used and ambient temperature of the place for the operation. (It is different depending on
major components of a solvent of the ink.)
(1) Estimated term of possible shutdown *1 *2
*1: Maximum period possible to be continuously shut down without operation.
it is necessary to operate it at least once during this period.
*2: Please not the ink may harden within a week when it is stored in 45 deg C or higher.
Storage
temperature
1067K, 1069K, 1072K, 2086K, 1087K, 1092F,
1095B, 1106K, 1113K, 1114K, 1117K
3112K
0 to 35°C 1 to 4 hours 2 to 8 hours
35 to 40°C 1 hour 2 hours
40 to 50°C 1 hour 2 hours
Since “Perform long-term shutdown storage work” requires special work,
it is recommended to contact your local distributor and ask for the work.
CAUTION
(2) Operation time per day