Site Preparation Guide
This guide provides information about planning and preparing for the installation of Hitachi Virtual Storage
Platform F350, F370, F700, F900 all-flash arrays and Hitachi Virtual Storage Platform G350, G370, G700,
G900 storage systems.
MK-97HM85015-00
Ma
y 2018

Other manuals for Hitachi Virtual Storage Platform G700

Question and Answer IconNeed help?

Do you have a question about the Hitachi Virtual Storage Platform G700 and is the answer not in the manual?

Hitachi Virtual Storage Platform G700 Specifications

General IconGeneral
BrandHitachi
ModelVirtual Storage Platform G700
CategoryStorage
LanguageEnglish

Summary

Preface and Document Conventions

Intended Audience for Site Preparation

Defines the target audience for this guide, including data center administrators and facility managers.

Document Conventions and Symbols

Explains terminology, typographic conventions, and icons used throughout the document for clarity and consistency.

Installation Site Considerations

Site Planning and Responsibilities

Details essential planning steps for successful installation, covering hardware, network, and role responsibilities.

Delivery, Space, and Environmental Requirements

Covers requirements for delivery paths, physical space, and maintaining appropriate environmental conditions.

Electrostatic Discharge and Space Management

Addresses ESD prevention measures and detailed space requirements for system placement and service access.

Cable Management Planning

Discusses planning for rack installations to ensure operational efficiency, ease of maintenance, and safety.

Using the BECK Tool for Configuration

BECK Tool Setup and Requirements

Lists system specifications, installation procedures, and drive tray specifications for the BECK tool.

BECK Tool Configuration and Editing

Guides on creating, editing, and managing logical and physical configurations using the BECK tool interface.

Advanced BECK Tool Operations

Covers expanding configurations, saving/loading files, and working with simple trace files in the BECK tool.

Power Requirements and Management

Power Cable and Electrical Specifications

Details power cable usage guidelines and essential electrical requirements for system controllers and drive trays.

Power Considerations and Interference

Discusses power demands, three-phase power, and sources of electrical interference affecting the system.

Branch Circuits and Emergency Power

Recommends redundant branch circuits for reliability and advises on installing emergency power-off controls.

Site Preparation Checklist

Safety, Space, and Infrastructure Checks

Evaluates computer room safety, space planning, floor adequacy, and infrastructure completeness.

Electrical and Access Checks

Covers computer room electrical requirements, site access controls, and security measures.