EasyManua.ls Logo

Hitachi VSP F350 - Page 15

Hitachi VSP F350
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Item Description
1 Bezel slots
2 Tabs
3 Key
4. On the lower left front side of the controller, press and hold the POWER ON/OFF
button until the POWER LED changes to green (about 3 seconds), and then release
the button.
Item Description
1 Controller (front bezel attached)
2 Controller (front bezel removed)
3 READY LED on controller (front bezel removed)
4 POWER LED on controller (front bezel removed)
5 READY LED on controller (front bezel attached)
6 POWER LED on controller (front bezel attached)
5. Wait for the green READY LED on the front of the controller to go on (approximately
16-25 minutes).
Note: If the READY LED does not go on after 30 minutes, contact
customer support.
Step 5: Power on the storage system
Installing your storage system
Storage system installation (without SVP) 15

Related product manuals