4
1. Drag the track onto the mounting slot.
3. Tighten the screws at the track fixing point.
2. Screw the top bracket and both ends.
Install the track
5.Install multiple top brackets - one at every
one metre.
6. Install end hooks at both side ends.
The end of the curtain cloth should be hung
on the end hook.
4. Installation is complete.
Note:
1. Large rail top bracket groove is shallow, small
rail top bracket groove is deep, please pay
attention to distinguish the two.
2. The pulley must be reset before installing the
boom arm and subsequent operation.
3. If the installation groove is wooden, it can be
inserted directly in but if it is concrete, it needs to
be set in position. Hit the hole with an electric
drill, then plug into the fish-shaped sheath
before entering the screw. Please pay special
attention to not scratch the track with screws!
5. curtain motorInstall 6. Auto close
7. complete