EasyManua.ls Logo

Honeywell ALERTON ACM-AXM - Page 70

Honeywell ALERTON ACM-AXM
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Operations Guide
|
ACM-VLX/VLX/EXP/AXM
70
© Honeywell. All Rights Reserved. LT-VLXEXPAXMIOG Rev. 01
Table 17 Te st de s criptions and corres ponding diagnos tic LED patte rns
Te s ts Des c riptio n
LED patte rns
CPU SYS ROC DDC
1
SRAM data bus tes t Isolates shorted or
ope n line s on the VLX/VLX-Platinum S RAM
data bus . The tes t writes a s e rie s of data
value s, e ach with a s ingle bit s e t, to diffe re nt
SRAM locations.
ON OFF OFF OFF
2 SRAM addre s s bus tes t Isolate s s horte d or
ope n addre s s line s on the VLX/VLX-Platinum
SRAM addres s bus .
OFF ON OFF OFF
3 SRAM data c ell te s t Ve rifie s that e ach
SRAM ce ll is functional. Each ce ll is writte n to
and the n value s are ve rifie d with two te s t
patte rns .
ON ON OFF OFF
4 EEPROM S PI inte rfac e te s t Ve rifie s that
VLX/VLX-Platinum EEPROM is pre s e nt and
responds corre ctly to VLX/VLX-Platinum
requests to re ad and write data.
OFF OFF ON OFF
5 EEPROM data re tentio n te s t Verifie s
inte grity of EEPROM data cells. Re ads curre nt
EEPROM data, write s data to e ach ce ll, reads
data back, and the n re s tore s original data.
ON OFF ON OFF
6 Re al-time clock tes t Ve rifie s that the re al-
time clock compone nt is present, re s ponds
correctly to VLX/VLX-Platinum commands, and
keeps accurate time.
OFF ON ON OFF
7 DUART inte rfac e tes t Ve rifie s that the se rial
DUART us e d for MS TP and EXP/AXM
communications is pres e nt and re s ponds
correctly to VLX/VLX-Platinum commands.
The te s t ve rifie s that the DUART re gis ters hold
writte n value s .
ON ON ON OFF
8 MSTP c o mm. channe l te s t Ve rifie s that the
onboard MS TP channe l is ope rational.
OFF OFF OFF ON
9 EXP c o mm. channe l te s t Ve rifie s that the
onboard EXP/AXM communications channel is
operational.
ON OFF OFF ON
10 PTP c omm. c hannel te s t Ve rifie s that the
se rial communications controlle r is ope rational.
OFF ON OFF ON
All te s ts comple te --OK Flash ON the n OFF.

Related product manuals