EAGLE CONTROLLER – INSTALLATION & COMMISSIONING INSTRUCTIONS
9 EN1Z-0970GE51 R1112
MOUNTING/DISMOUNTING
Before Installation
IMPORTANT
To allow the evaporation of any condensation resulting from low shipping / storage temperatures, keep the controller at
room temperature for at least 24 h before applying power.
US requirement, only: This device must be installed in a UL-listed enclosure offering adequate space to maintain the
segregation of line voltage field wiring and Class 2 field wiring.
In the case of vertical mounting on DIN rails, the EAGLE controller should be secured in place using a commercially-available
stopper
See also the EAGLE Mounting Instructions (MU1Z-0970GE51).
Dimensions
110
57.5
49.5
55.5
215.5
5245
BI1
BI2
BI3
BI4
GND
UI1
UI2
UI3
UI4
UI5
UI6
UI7
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
UI8
47
BO1
BO2
BO3
IN
IN4
BO4
BO5
IN5
IN6
BO6
BO7
IN7
IN8
BO8
GND
AO1
AO2
AO3
5
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
24V-0
24V~
1
AO4
23
GND1
485-1+
485-1-
n.a.
n.a.
GND2
485-2+
485-2-
n.a.
UI9
UI10
!
L1 L2 Tx Rx
2
Fig. 15. EAGLE Controller, dimensions (in mm)
147
57.5
52
55.5
215.5
Fig. 16. EAGLE Controller (shown here with two MVC-80-AC1 covers in place), dimensions (in mm)
NOTE: Use of the MVC-80-AC1 will obstruct access to the ETHERNET and USB 2.0 Device Interfaces