EasyManua.ls Logo

Honeywell RAEGuard 2 PID User Manual

Honeywell RAEGuard 2 PID
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
___________________________________
User Guide
___________________________________
P/N: H-D03-4001-000
Rev M February 2018
RAEGuard 2 PID
Question and Answer IconNeed help?

Do you have a question about the Honeywell RAEGuard 2 PID and is the answer not in the manual?

Honeywell RAEGuard 2 PID Specifications

General IconGeneral
Sensor TypePhotoionization Detector (PID)
Target GasVolatile Organic Compounds (VOCs)
Operating Temperature-20°C to +50°C (-4°F to +122°F)
Output Signal4-20 mA, RS-485 Modbus
Ingress ProtectionIP65
Operating Humidity0 to 95% RH (non-condensing)
DisplayLCD

Summary

General Information

General Specifications

RAEGuard 2 PID Specifications

Detailed technical specifications including basic, environmental, physical, and certification parameters.

Proper Product Disposal At End Of Life

Operation

Physical Description

Physical Dimensions

Installation and Access Instructions

Mounting

Instructions and diagrams for mounting the RAEGuard 2 PID unit to walls or poles.

Instrument Disassembly

Step-by-step guide for safely taking apart the RAEGuard 2 PID for servicing and maintenance.

Electrical Wiring

Details on connecting the RAEGuard 2 PID to peripheral equipment using terminal blocks.

Wiring Procedure

Step-by-step instructions for connecting wires to the terminal blocks for proper operation.

Earth Grounding Instructions

Procedures for proper external and internal earth grounding of the RAEGuard 2 PID.

Alarm Contact Setup

Configuration of alarm relays (normally open/closed) for external signals like lights or buzzers.

Display And User Interface

User Interface

Overview of the RAEGuard 2 PID's display, status LED, and magnetic key interface.

Magnet Key

Description of the magnetic key used for interacting with the device's interface.

Using The Magnet Key

Instructions on how to use the magnetic key to navigate the RAEGuard 2 PID interface.

System Initialization

Describes the startup sequence, self-test, and warm-up process of the RAEGuard 2 PID.

Reading Display

Explains how the RAEGuard 2 PID displays gas concentration and status indicators.

Instrument Status Display

Details on interpreting the various status indicators, LEDs, and LCD messages on the device.

Related product manuals