start day, 42
start time, 42
window duration, 42
creating, 40
loading blank media, 44
loading media, 44
operations, 39
restoring from a physical cartridge, 43
echo copy pool policy
at end of the policy window
LAN/WAN, 42
SAN, 41
deduplication timeout, 42
echo copy on source cartridge eject, 41
priority, 42
retention days, 40
send notification if cartridge not migrated in, 41
send notification if cartridge not replicated in, 42
sizing factor, 40
source cartridge size limit, 41
start mirror of Out of Synch cartridges, 41, 42
echo copy, concepts, 33
Edit Configuration, 66
Edit Data Protector Configuration, 72
Edit LAN/WAN Replication Target Settings, 63
Edit Policy Window, 50
Edit Virtual Library, 97
editing
workload assessment template, 131
Eject Media, 56
electrostatic discharge
grounding methods, 14
preventing, 13, 154
email settings, 115
emergency login, 82
emulations see VLS device emulations
environmental specifications, 179
Ethernet Switch 2510–24
replacing, 163
specifications, 178
Ethernet Switch 6600–24G
cabling, 22
rack mounting, 19
European Union notice, 181
Export Cartridge Details, 66
Export Log File, 66
exporting CSV data, 125
exporting data, 59
F
failover, 104
warm, 165
FC host port
changing settings, 137
Federal Communications Commission notice, 180
Fibre Channel host port, 137
changing the default settings, 87
LUN management, 90
firesafe, 101
automigration, 46
firmware, updating, 110
fully qualified name, setting, 85, 136
G
gateway to network, setting, 85, 137
Global LAN/WAN Replication Target Settings, 63
glossary, 194
grounding methods, 154
H
help, obtaining, 171
host
name setting, 85, 136
VLS device, 24
HP
contacting, 170
document conventions, 168
storage documents, 168
storage web site, 168
Subscriber's choice web site, 171
I
icon
cancel job, 61
navigation tree, 113
Notification alert, 113
pause job, 61
resume job, 61
status banner, 112
Identity tab
Contact, 87
Contact Phone, 87
E-mail, 87
IP address, 83
Location, 87
VLS IP address, 137
VLS serial number, 111
Warranty Serial Number, 87
importing tapes, 60
In Use/Deduplicating, 65
Initializing, 65
Initiate Tape Transport, 59, 60
Insight Remote Support, 172
installation, 13
ESD precautions, 13
grounding methods, 14
identifying shipping carton contents, 15
rack requirements, 15
rack warnings, 15
racking planning resources, 14
removing packing materials, 14
tools, 13
unpacking, 14
VLS12000 shipping carton contents, 16
VLS12200 expansion system shipping carton, 16
IP address, setting, 85, 137
201