Document No. : Ludao disassembly SOP station :
Operation Name : Ver. : Edit date
Step:
Standard Operation Procedure
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Safe
Order
Hear
Look
manu
al
Static
Qual
ity
Fix
tur
e
Issue Department:
Lister:
Zhou. Gui-lin
Industrial Engineering Class
Disassemble Hood sensor
8(2/2)
1. Take the housing from the middle body(pic1)
2. Take cable CNTR (pic2)
pic1
pic2
For Hood sensor SKU
2、pull out the right hook with the torque
1、take housing left hook to the right to popup
Half finger insert 1
2020/7/1
0.20