Document No. : Ludao disassembly SOP station :
Operation Name : Ver. : Edit date
Step:
Standard Operation Procedure
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Safe
Order
Hear
Look
manu
al
Static
Qual
ity
Fix
tur
e
Issue Department:
Lister:
Zhou. Gui-lin
Industrial Engineering Class
Disassemble top cover
Half finger insert 1
1(1/1)
1. Press the detachable button to the right to pop out the top cover;(pic1)
2.Lift the top cover and take it out in the oblique direction;(pic2)
Lift the top cover and take it out in the oblique direction
Press the detachable button to the right
Pic1
Pic2
2020/7/1
0.20