EasyManua.ls Logo

HPRT MPT-II

HPRT MPT-II
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MPT-II User Manual
www.hprt.com
12
Chapter 3 Operation
Methods
3.1 Preparation before using
3.1.1 Li-ion battery installation
1) Refer to the picture, put the battery in the battery slot, pls pay attention to the
correct positive and negative.
2) Close the battery case.
3.1.2 Paper loading
Operation methods:
1) Use two fingers to press the place showed in the picture and open the upper
cover.
2) Put the paper into the paper case, pay attention to the direction of the paper. If
loaded reversely, it won’t print.
3) Pull paper out of paper case.
4) Make sure paper in the center then close upper cover.

Related product manuals