EasyManuals Logo

Huawei BTS3900A Quick Installation

Huawei BTS3900A
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
IBBS200D
Power
Overview of the Cabinets
CMUE
Power
distribution box
Power box of the
heating film
Grounding bar
Installing the Base
The installation blocks are placed in the auxiliar
y
material package of the RFC.
Φ16
52-60 mm
90°
Φ16
Base
Expansion
Flat was
h
Spring w
a
M12x60
B
Concrete
plinth
Installing the Cabinets
Concrete
plinth
Expansion
tube
Re
m
pla
t
1 Attaching the Cabinet to the Base
Installing
the
Cabinets
2. TM
C
1. RFC
M12x30 Bolt
(×2)
Gaske
t
an obl
o
hole
2
IBBS200T
Power
CMUE
Power
distribution box
Grounding bar
Level
bar
y
M12x40
Install two installation
blocks on the base
before installing only
the RFC.
Remove the
baffle plates
from the both
sides and the
rear of the
base.
Bolt (×2)
Expansion bolt (x4)
n
h
er
a
sher
B
olt
Adjusting pad
n
m
ove the front cover
t
e from the base.
C
11H/IBBS200T/IBBS200D
By attaching the IBBS200D as an example, attaching
the TMC11H or the IBBS200T to the base is the same.
M12×30
Bolt(×4
t
with
o
ng
Gasket with an
oblong hole
2

Other manuals for Huawei BTS3900A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei BTS3900A and is the answer not in the manual?

Huawei BTS3900A Specifications

General IconGeneral
BrandHuawei
ModelBTS3900A
CategoryAccessories
LanguageEnglish

Related product manuals