EasyManua.ls Logo

Huawei FusionSolar SmartPVMS - Page 30

Huawei FusionSolar SmartPVMS
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NO TE
The parameter settings vary depending on the SmartLogger version. Set the parameters
based on requirements.
Step 2 Choose Maintenance > System Maint., and import the conguration of the old
SmartLogger to the new SmartLogger3000.
Figure 5-2 Import
congurations.
NO TICE
When a faulty SmartLogger3000 is replaced with a new SmartLogger3000, the full
conguration le does not contain certicate-related les. After the full
conguration le is imported, you need to reload a third-party certicate if
required.
Step 3 (Optional) Choose Maintenance > Device Mgmt. > Data Re-collection to
synchronize inverter information.
NO TE
In a faulty SmartLogger2000 or SmartLogger1000A is replaced with a SmartLogger3000,
the full conguration le exported from the SmartLogger2000 or SmartLogger1000A does
not contain the performance data or energy yield information of inverters. Synchronize the
data if required.
FusionSolar Smart PV Solution-Device Replacement
Commissioning Guide
5 Replacing the SmartLogger3000/
SmartLogger2000/SmartLogger1000A/
SmartLogger1000 with the SmartLogger3000
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. 26

Related product manuals