EasyManua.ls Logo

Huawei SUN2000-8KTL-M1 User Manual

Huawei SUN2000-8KTL-M1
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SUN2000-(3KTL-10KTL)-M1 Series
User Manual
Issue 17
Date 2024-01-12
HUAWEI TECHNOLOGIES CO., LTD.

Table of Contents

Questions and Answers:

Huawei SUN2000-8KTL-M1 Specifications

General IconGeneral
Max. Efficiency98.6%
Max. Input Voltage1100 V
Nominal Input Voltage600 V
Number of MPP Trackers2
Max. Output Power8000 W
Nominal Output Frequency50 Hz / 60 Hz
Weight17 kg
Max. apparent AC power8800 VA
Rated AC power8000 W
Operating Temperature Range-25°C to +60°C
CoolingNatural Convection
Protection DegreeIP65
Warranty10 years
Nominal Output Voltage230 V / 400 V

Summary

1 Safety Information

1.1 Personal Safety

Details safety precautions for individuals, including PPE and general safety rules for handling equipment.

1.2 Electrical Safety

Outlines critical electrical safety measures, including grounding, cable handling, and shock prevention.

4 Installation

4.3 Determining the Installation Position

Guides on selecting an appropriate installation location based on environmental and space requirements.

5 Electrical Connections

5.1 Precautions

Outlines essential safety precautions and warnings before making any electrical connections to the SUN2000.

5.2 Installation Preparation

Details steps and components needed, including cable preparation, before performing electrical connections.

5.4 Connecting the AC Output Power Cable

Provides instructions for safely connecting the AC output power cable to the SUN2000.

5.5 Installing DC Input Power Cables

Guides on how to correctly connect the DC input power cables from PV strings to the SUN2000.

6 Commissioning

6.1 Checking Before Power-On

Provides a checklist for verifying all components and connections before powering on the SUN2000 for operation.

6.2 SUN2000 power-on

Details the step-by-step procedure for powering on the SUN2000 and checking its status via LED indicators.

7 Man-Machine Interaction

7.2 Parameters Settings

Explains how to configure various parameters for the SUN2000, including energy control and battery settings.

8 Maintenance

8.3 Troubleshooting

Guides users on how to diagnose and resolve potential issues, referring to the Inverter Alarm Reference for details.

10 Technical Specifications

B Device Commissioning

Step 1 Access Device Commissioning screen

Guides on accessing the Device Commissioning screen within the FusionSolar app for initial setup.

C Resetting Password

D Rapid Shutdown

NO TE

Notes regarding rapid shutdown function support and behavior when optimizers are configured.

Perform the following step to trigger rapid shutdown

Outlines methods to trigger the rapid shutdown function, including switch operations and AFCI detection.

E Locating Insulation Resistance Faults

NO TICE

Notice regarding limitations in locating faults when multiple issues occur in a single PV string.

Step 1 The AC power supply is connected

Initial steps for fault location: connecting AC power and setting DC switches to OFF.

Step 2 Connect each PV string

Details connecting PV strings sequentially and checking for insulation resistance alarms.

Step 4 Set the DC switch to OFF

Steps to inspect and replace faulty components identified during insulation resistance fault diagnosis.

Related product manuals