EasyManua.ls Logo

Huawei SUN2000-6KTL-L1 User Manual

Huawei SUN2000-6KTL-L1
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
0
HUAWEI TECHNOLOGIES CO., LTD.
SUN2000-(2KTL-6KTL)-L1
Quick Guide
Issue: 06
Part Number: 31500DQD
Date: 2020-12-02
Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-6KTL-L1 and is the answer not in the manual?

Huawei SUN2000-6KTL-L1 Specifications

General IconGeneral
SafetyEN/IEC 62109-1, EN/IEC 62109-2
Efficiency98.4 %
Product type-
Maximum power9000 W
Output current27.3 A
DC input voltage350 - 450 V
Number of phases1
Output frequency50/60 Hz
Starting voltage100 V
Output power capacity (max)6 kVA
Input operation voltage (max)560 V
Input operation voltage (min)90 V
Output operation voltage (max)240 V
Output operation voltage (min)220 V
Operating temperature (T-T)-25 - 60 °C
Operating relative humidity (H-H)0 - 100 %
Wi-FiYes
Product colorWhite
Power protection featuresOver current, Over voltage, Overheating, Reverse polarity, Short circuit
International Protection (IP) codeIP65
Weight and Dimensions IconWeight and Dimensions
Width365 mm
Height156 mm
Weight12000 g

Summary

Overview

Installing the Device

Installation Requirements

Specifies spatial and angular requirements for installing the device correctly.

Installing the Solar Inverter

Provides step-by-step instructions for mounting the solar inverter onto its bracket.

Connecting Cables

Preparing Cables

Outlines required cable types, conductor sizes, and outer diameters for connection.

Installing the PE Cable

Details the procedure for connecting the protective earthing (PE) cable to the device.

Installing a WLAN Antenna or Smart Dongle

Instructions for installing communication modules like WLAN antennas or Smart Dongles.

Installing the AC Output Power Cable

Step-by-step guide for connecting the AC output power cable to the inverter's AC connector.

Installing DC Input Power Cables

Covers assembling DC connectors and connecting DC input power cables to the inverter.

(Optional) Installing Battery Cables

Guidelines for connecting battery cables, emphasizing correct polarity to avoid damage.

(Optional) Installing Signal Cables

Instructions for connecting signal cables, ensuring proper routing and shielding.

COM Port Pin Definitions

Explains the pinout and function of the COM port for communication.

Verifying the Installation

Powering On the System

Commissioning

Downloading the App

Guide on obtaining and installing the necessary FusionSolar mobile application.

(Optional) Registering an Installer Account

Procedure for creating a new installer account within the FusionSolar platform.

Creating a PV Plant and a Plant Owner

Steps to register a new PV plant and assign an owner in the system.

Setting the Physical Layout of Smart PV Optimizers

Process for configuring the physical layout of PV modules and optimizers in the app.

Setting Battery Parameters

Configuration options for battery settings, including charge/discharge modes.

FAQ

Device Commissioning

Addresses common issues and scenarios encountered during device commissioning.

Resetting the Password

Detailed steps for resetting the device's login password and initial setup.