5.3 Installing DC Power Cables
Prerequisites
The ESS is not powered on.
The DC power cables have been pre-buried according to the specications.
The OT/DT terminals have been crimped according to the specications. For
details, see C Crimping an OT or DT Terminal.
Procedure
Step 1 Remove the protective cover
Figure 5-13 Removing the protective cover
LUNA2000-2.0MWH Series Smart String ESS
User Manual 5 Installing Cables
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 120