Loading...
Figure 7-3 Installing the Solenoid Valve
----End
7.3 Power-on Process
NO TICE
The following gure is used only to guide the power-on sequence of the system.
Do not use it for onsite cable connections.
LUNA2000-2.0MWH Series Smart String ESS
User Manual 7 Powering On the System
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 143