EasyManua.ls Logo

Huawei NetEngine-8000-M8 - Board Indicator Status and Handling; Board Indicator Checks and Exception Handling

Huawei NetEngine-8000-M8
26 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Checking Board Indicators
25
Indicator Abnormal
State
Cause Handling Procedure
STAT Steady red The receive optical
power at the local end is
zero.
1. Power on the chassis that interconnects with
the local chassis.
2. Ensure that the transmit optical power of
boards interconnecting with local boards is within
the specified range.
3. Ensure that fibers are correctly connected.
4. If no FOAs are installed on optical ports, check
the fiber attenuation. If the fiber attenuation is not
within the specified range, clean fiber connectors
or replace any damaged fibers.
Off Boards cannot be
detected.
If the chassis is powered on but all board
indicators are off, contact software
commissioning engineers to replace the boards.
Handle any exceptions onsite.

Related product manuals