5
Installing Ground Cables for Modules
8.1
8
Installing Cables
Route inter-device cables through the pole.
Module ground cable
1. Connect ground cables between the function module and lithium batteries.
2. Connect the other end of the module
ground cable to the pole ground bar.
Pole ground bar
Function module Lithium battery Lithium battery
Installing Cables for the Maintenance Compartment
8.2
GE3/P&E(++) - GE7 /P&E(++)
Dome camera alarm
linkage cable
Bullet camera power cable
Cable Hole Diameter Requirements
1. Push up the sunshade
until the spring fastener
is stuck gently.
2. Open the maintenance
compartment.
3. Install cables for P&E cameras.
Installation Procedure
Cables for the dome
camera can only be
connected to the
P&E(++) ports.
Bullet camera 1
Bullet camera 2
Dome camera 2