30
Powering On the Equipment
Before powering on the equipment, ensure that
The installation of the ODU, IF jumpers, and IF cables is complete.
You are familiar with the precautions for handling power cables.
The ODU power switches on the IDU of the RTN 905 2A/2E are turned off.
To power off the RTN 905 2F, you need to perform related operations on the NMS. By default, the RTN 905
2F is powered off on the NMS.
Under normal conditions, STAT, PWRA, and PWRB indicators are on (green). For description of indicator
states, see the RTN 905 IDU Hardware Description.
STAT
SRV
PWRA
PWRB