Huawei iManager NetEco 6000 User Manual

Huawei iManager NetEco 6000
323 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
iManager NetEco 6000
V600R008C00
Device Installation and Commissioning
Guide
Issue
03
Date
2019-03-10
HUAWEI TECHNOLOGIES CO., LTD.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Huawei iManager NetEco 6000 and is the answer not in the manual?

Huawei iManager NetEco 6000 Specifications

General IconGeneral
BrandHuawei
ModeliManager NetEco 6000
CategoryServer
LanguageEnglish

Summary

Safety Precautions

General Safety Precautions

Covers declaration of non-liability, overview of safety symbols, and local safety regulations.

Electrical Safety

Details precautions related to high voltage, high electrical leakage, power cables, and electrostatic discharge.

Battery Safety

Outlines safety precautions for operating batteries, including handling, short circuits, harmful gas, and temperature.

Mechanical Safety

Provides precautions for moving sharp and heavy objects, drilling holes, and fan safety.

Installing Devices

Installing a Server

Provides step-by-step instructions for installing a server, including guide rails and power cables.

Installing Sensors

Covers the installation of various sensors like NTC Temperature, Hydrogen Detection, Smoke, Infrared, and Water sensors.

Installing the Video Management System

Details the installation procedures for VCN500 devices and IPC cameras.

Installing the Access Management System

Covers the installation of access controllers, magnetic locks, card readers, and emergency door release buttons.

Connecting Monitoring Cables to Devices

Scenarios for Connecting the LAN Switch

Details switch port descriptions and connecting monitoring cables to NetEco, cameras, and smart cooling products.

Connecting the UPS Monitoring Cable

Explains how to connect monitoring cables for UPS2000-G, UPS5000G-A, UPS5000-E, and UPS5000-S.

Checking the Installation

Checking the Installation of the Cabinet

Provides a checklist for verifying the proper installation and placement of cabinets.

Checking the Installation of Power Cables and Ground Cables

Details checks for power and ground cable connections, including material, continuity, and secure crimping.

Adding Devices

Device Maintenance

Routine Maintenance

Details routine maintenance procedures for collectors, VCN, smoke detectors, hydrogen detection systems, and infrared sensors.

Parts Replacement

Covers procedures for replacing ECC500 collectors, expansion cards, ECC800 main control modules, and independent deployment AI/DI units.

FAQ

What Can I Do If the ECC500 Collector Cannot Be Logged In on the WebUI?

Offers solutions for WebUI login issues, including Internet Explorer settings and trusted sites configuration.

How to log In to the ECC800 WebUI

Guides on logging into the ECC800 WebUI, including PC IP configuration and Internet Explorer settings.

How Do I Change the NetEco IP Address?

Details the process of changing the NetEco server IP address and updating it on connected devices.