Do you have a question about the Huawei 5288 V5 and is the answer not in the manual?
Document based on industry and Huawei server specifications for acceptance tests to verify equipment meets customer requirements.
Steps to follow before performing acceptance tests, including obtaining OS, agreeing on test items, and observing rules.
Diagram illustrating the network setup for server testing, including iBMC, switches, and the tested server.
Details on the hardware and software components required for server acceptance testing.
Defines the test result states: PASS, FAIL, and NT (Not Tested) with their meanings.
Covers fundamental checks of the server's hardware and OS installation, including hardware, installation, and configuration.
Tests various management functions of the server, including indicators, LEDs, and remote control features.
Evaluates the server's reliability by testing redundancy features for PSUs, fans, and hard disks.
Assesses the server's long-term stability performance by running a stress test for an extended period.
Section to record general information about the tests performed, including manufacturer and device model.
A comprehensive list of all test cases, their numbers, names, and the final test results (PASS/FAIL/NT).
Area for customers to provide feedback or suggestions regarding the server and the acceptance test.
Formal section for signing off on the acceptance test results by Huawei and the customer.