EasyManua.ls Logo

Hunter H39 - Steering System

Hunter H39
216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Documents and Forms
Anchor System and Ground Tackle
____ Anchor windlass inspected per manufacturers recommendation
____ Anchor secured in bow roller assembly
____ Spare anchor onboard and accessible.
____ See Chapman’s Manual for recommendations on anchors, anchor lines and drogues
____ Anchor line pays out and retrieves into anchor locker without difculty
____ Bitter end of anchor line secured
____ Anchor rode inspected and free of abrasions
____ Anchor chain shackle lock-wired at pin after secured to anchor and corrosion free
____ Anchor locker hatch secures properly with anchor and line in place
____ Anchor locker free of debris inside
____ Anchor locker drains open
Fuel System
____ Tank fuel level indicator functioning properly
____ Fuel clean and treated with engine manufacturers recommended additives
____ Primary and secondary lters cleaned or replaced
____ Fuel tank supply valves open
____ Fuel tank vent clear from tank to atmosphere (hose has anti-siphoned loop in place at hull or deck side)
Steering System
____ Inspect and service steering system according to manufacturers recommendation
____ Clean and grease autopilot drive chains
____ Ensure compass light is operational
Primary Pumps Functional
____ Manual bilge pumps
____ Electric bilge pumps and oat switches (discharge hose has anti-siphon loop in place to prevent back ow under sail)
____ Macerator pumps
____ Fresh water pumps
____Toilet ush pumps
____ Shower sump pumps
____ High water bilge alarm pump
Illumination and small electrical components check
____ Bow light
____ Cabin lights
____ Stern light
____ Deck light
____ Instrument lamps
____ Masthead light
____ Chart light
____ Anchor light
____ Courtesy lights
____ Reading lights
____ Distribution panel lights
2.5

Table of Contents

Related product manuals