EasyManua.ls Logo

Husqvarna P524 - Maintenance; Maintenance Schedule

Husqvarna P524
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English – 19
Maintenance
Maintenance schedule
The following is a list of the maintenance which should be conducted on the machine. For those points not described in this manual,
visit an authorised service workshop.
Maintenance
Daily
maintenance
After the first
25 hours
Weekly
maintenance
1)
At least once
a year
Maintenance
interval in hours
40 100 200 400
Cleaning X
Clean the air filter. X X X
Clean thoroughly around transmission X
Check the engine’s oil level X
Check the engine’s cooling air intake X
Check the fuel pump air filter X
Check the safety system X
Check nuts and screws O
Check for fuel and oil leakage. O
Clean around the silencer O
Start engine and blades, listen for noise O
Clean transmission air intake X X
Lubricate according to lubrication schedule,
see under heading "LUBRICATION"
X X X
Change engine oil
1)
X X X X
Check the cutting deck X
Check and adjust the air pressure in the
tyres (100 kPa, 1.0 bar, 14.5 PSI).
X X X
Lubricate belt tensioner (nipple) X X
Lubricate the driver’s seat X
Lubricate all wires X
Lubricate bearing surfaces on cutting unit X
Clean inside frame tunnel X
Lubricate the pedal system in the frame
tunnel
X

Table of Contents

Other manuals for Husqvarna P524

Related product manuals