EasyManua.ls Logo

Hussmann Q2SSM4S - Start up Check List

Hussmann Q2SSM4S
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P/N 0562873_M 1-5
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Q1, Q2, Q3 Merchandisers
Equipment Start-Up Check List:
Step Startup Activity Check
1
Locate, read and maintain install/operation manual in a safe place for
future reference.
2 Examine unit. Confirm there is NO damage or concealed damage.
3 Level the unit, side to side and front to rear.
4 Remove all shipping brackets and straps
5
Unit must be run on a dedicated electrical circuit without the use of
an extension cord.
6
Ensure that the proper electrical requirements for the equipment are
supplied.
7
Check that shelves are installed evenly.
LEGAL DISCLAIMER:
Hussmann shall not be liable for any repair or replacements made without the written consent of Hussmann, or when the product is installed or operated in a manner
contrary to the printed instructions covering installation and service which accompanied such product.
Verify lights turn on and off and there is no exposed wiring.
8

Related product manuals