3.7.6 Sidewall vent termination
Caution
Vent termination clearances in this section are code minimum, or IBC-recommended
minimum requirements, and may be inadequate for your installation. Building envelope
details must be examined carefully. Take action to avoid moisture entering building
structures. Serious structural damage may occur if adequate precautions and
clearances are not considered. These precautions apply to neighboring structures as
well as to the structure the boiler(s) are installed in.
Vent terminal
Air supply inlet
Area where terminal is not permitted
Figure 15 Minimum clearances from vent/air inlet terminations
29
3.7.6 Sidewall vent termination

Table of Contents

Other manuals for IBC SL 26-260 G3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBC SL 26-260 G3 and is the answer not in the manual?

IBC SL 26-260 G3 Specifications

General IconGeneral
BrandIBC
ModelSL 26-260 G3
CategoryBoiler
LanguageEnglish

Related product manuals