EasyManua.ls Logo

IBC SL 26-260 G3

IBC SL 26-260 G3
121 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
65
6.0 Boiler operation
Before operating the appliance, there are some important pre-igntion checks that need to be
performed. For more information, see Before operating the boiler on page 63. To understand the
boiler start-up process, see Sequence of Operation on page 107.
6.1 Lighting and shutting down the boiler
Start-up Checklist Check
Followed lighting and shutting down procedure.
Tested the ignition safety shutoff function (see Testing the ignition safety shutoff on page
66).
Checked the appliance's fuel source, and if necessary, performed a fuel conversion using
the appropriate P-kit.
Performed gas pressure test by measuring the inlet gas pressure.

Table of Contents

Other manuals for IBC SL 26-260 G3

Related product manuals