Installation Instructions
PHF3 Series
2 to 4 TON
PACKAGE HEAT PUMPS
TABLEOF CONTENTS
UNITDIMENSIONS......................................... 2
SAFEINSTALLATIONREQUIREMENTS ......................... 3
LOCATINGTHE UNIT ....................................... 3
CLEARANCES ............................................ 3
INSTALLATION............................................ 3
GROUNDLEVELINSTALLATION .............................. 4
ROOFTOPINSTALLATION................................... 4
HOISTING................................................ 4
DOWNFLOWCONVERSION.................................. 4
CONDENSATEDRAIN....................................... 4
ELECTRICALWIRING ................................... 5
DUCTWORK.......................................... 6
FILTERS............................................. 6
AIRFLOWADJUSTMENT ................................ 7
START-UPPROCEDURES ............................... 7
SEQUENCEOF OPERATION.............................. 8
MAINTENANCE ....................................... 9
RIGGING ........................................... 11
WIRINGDIAGRAMS ................................ 12- 13
C_US
°_'_° _°_° LISTED
518 01 1201 01 2-18-09
Printed in U.S.A.
Question and Answer IconNeed help?

Do you have a question about the ICP PHF324000K00A1 and is the answer not in the manual?

ICP PHF324000K00A1 Specifications

General IconGeneral
BrandICP
ModelPHF324000K00A1
CategoryHeat Pump
LanguageEnglish

Summary

Unit Dimensions

Safe Installation Requirements

Minimum Clearances to Combustible Construction

Specifies minimum distances from the unit to combustible materials for safety.

Locating the Unit

Access Panels

Information on locating and identifying unit access panels for servicing.

Clearances

Details required clearances around the unit for proper airflow and servicing.

Installation

Ground Level Installation

Requirements and procedures for installing the unit on a ground-level platform.

Rooftop Installation

Platform requirements and considerations for rooftop unit installation.

Hoisting

Instructions and precautions for safely lifting and positioning the unit.

Downflow Conversion

Steps to convert the unit for downflow air discharge configuration.

Condensate Drain

Electrical Wiring

Disconnect Switch

Requirements for a field-supplied disconnect switch for unit safety.

Ground Connections

Procedures for ensuring proper electrical grounding of the unit.

Line Voltage Wiring

Instructions for connecting the unit's main power supply wiring.

Thermostat / Low Voltage Wiring

Guidance on connecting the thermostat and low-voltage control wiring.

Ductwork

Ductwork Sizing

Recommendations for sizing ductwork to match unit capacity and airflow needs.

Ductwork Insulation

Requirements for insulating outdoor ductwork for efficiency and protection.

Filters

Information on filter types, sizes, and the importance of their installation.

Airflow Adjustment

Circulating Air Blower Speeds

Guide to selecting blower motor speeds for optimal airflow in heating and cooling.

Start-Up Procedures

Sequence of Operation

Cooling Operation

Describes the operational sequence for cooling mode for different unit sizes.

Heating Operation

Details the operational sequence for heating mode for different unit sizes.

Scroll Recycle Delay Timer

Explains the function of the compressor recycle delay timer.

Continuous Fan Operation

How the unit operates with the continuous indoor fan option selected.

Defrost Mode

Explains the unit's defrost cycle initiation and termination procedures.

Maintenance

Monthly Maintenance and Inspection Checks

Routine checks for air filters and condensate drains.

Annual Maintenance and Inspection

Annual inspection procedures, including cleaning coils and motors.

Condenser Fan Motor

Information regarding the condenser fan motor, including lubrication.

Blower Motor Access

Steps to access the blower motor for inspection or removal.

Motor Removal and Replacement

Procedures for removing and replacing blower motor components.

Circulating Air Blower

Inspection and cleaning of the blower wheel and compartment.

Rigging Instructions

Wiring Diagrams

2 to 3-1/2 Ton Wiring Diagram

Schematic illustrating the electrical connections for 2 to 3.5 ton units.

4 Ton Wiring Diagram

Schematic illustrating the electrical connections for 4 ton units.