Installation Instructions
PHF3 Series
2 to 4 TON
PACKAGE HEAT PUMPS
TABLEOF CONTENTS
UNITDIMENSIONS......................................... 2
SAFEINSTALLATIONREQUIREMENTS ......................... 3
LOCATINGTHE UNIT ....................................... 3
CLEARANCES ............................................ 3
INSTALLATION............................................ 3
GROUNDLEVELINSTALLATION .............................. 4
ROOFTOPINSTALLATION................................... 4
HOISTING................................................ 4
DOWNFLOWCONVERSION.................................. 4
CONDENSATEDRAIN....................................... 4
ELECTRICALWIRING ................................... 5
DUCTWORK.......................................... 6
FILTERS............................................. 6
AIRFLOWADJUSTMENT ................................ 7
START-UPPROCEDURES ............................... 7
SEQUENCEOF OPERATION.............................. 8
MAINTENANCE ....................................... 9
RIGGING ........................................... 11
WIRINGDIAGRAMS ................................ 12- 13
C_US
°_'_° _°_° LISTED
518 01 1201 01 2-18-09
Printed in U.S.A.
Question and Answer IconNeed help?

Do you have a question about the ICP PHF342000K00A1 and is the answer not in the manual?

ICP PHF342000K00A1 Specifications

General IconGeneral
BrandICP
ModelPHF342000K00A1
CategoryHeat Pump
LanguageEnglish

Summary

1. UNIT DIMENSIONS

2. SAFE INSTALLATION REQUIREMENTS

Minimum Clearances to Combustible Construction

Specifies required clearances from combustible materials.

3. LOCATING THE UNIT

Location Considerations

Details unit placement, access panels, clearances, and ground installation.

CONDENSATE DRAIN

Condensate Drain Information

Details on the condensate drain outlet and trap requirements.

4. ELECTRICAL WIRING

ELECTRICAL WIRING

2 to 3-1/2 Ton Thermostat Connections

Wiring details for 2 to 3.5 Ton models.

4 Ton Thermostat Connections

Wiring details for 4 Ton models.

Thermostat Heat Anticipator

Explanation of heat anticipator adjustment.

5. DUCTWORK

Ductwork Sizing and Insulation

Guidelines for ductwork sizing and outdoor insulation.

Filters

Information on required air filters and their sizes.

6. AIRFLOW ADJUSTMENT

Blower Speed Tap Settings

Explains blower motor speed tap connections for airflow.

7. START-UP PROCEDURES

8. SEQUENCE OF OPERATION

Cooling and Heating Operations

Describes cooling and heating cycle operation for different unit sizes.

Timer and Fan Operations

Details recycle timer, continuous fan, and defrost mode functions.

9. MAINTENANCE

Monthly Maintenance Checks

Routine checks including air filters.

Cooling Season Checks

Monthly checks during the cooling season, including coils and drains.

Annual Maintenance Checks

Comprehensive annual inspection items.

10. Rigging Instructions

Rigging Instructions and Weight Chart

Procedures and safety for rigging units, including weight data.

11. Wiring Diagrams

2 to 3-1/2 Ton Wiring Diagram

Schematic for wiring 2 to 3.5 Ton models.

4 Ton Wiring Diagram