FanCoils
INSTALLATION,OPERATION,&MAINTENANCEMANUAL
6
SECTIONONE—Receipt&InitialInstallation,Cont'd.
Figure 2. Threaded Rod Suspension
Isolators - 4 per unit
(eld furnished and
installed)
Washer and Double Nut (eld
furnished and installed)
5/8” knockouts for
suspension rods (4
places top and 4 places
bottom of unit)
Threaded Rod
Suspension (eld
furnished and installed)
Figure 3. Mounting Details – Threaded Rod Suspension
Washer
Double Nuts
Trapeze
Bolt
Othereld-furnishedmountingdevicessuchasrubber-
in-shearorspring-typevibrationisolatorsselectedby
thecontractorortheengineermaybesubstitutedforthe
factorygrommets,andshouldbeusedwherefactory
grommetsarenotprovided.
VerticalunitmodelsFHY,FSY,orFXYaredesignedtobe
oormountedorotherwisesupportedfrombelow,and
boltedtothewallstructurethroughthemountingholes
providedinthechassis.Theseunitsmaybewallhungonly
whenoriginallyorderedfromthefactoryforwall-mount
applications.Hi-PerformanceverticalclosetunitsVEY
aredesignedtobeoormountedorotherwisesupported
frombelowandmaybeanchoreddirectlythroughthe
cabinetoorortheoptional6-inchlegs.
Thetypeofmountingdeviceisamatterofchoice,however
themountingpointshouldalwaysbethatprovidedin
thechassis,plenum,orcabinet.Refertotheunitproduct
drawingsformountingholelocationsandsizes.
Aftermountingtheunit,itisthenreadyforthevarious
serviceconnectionssuchaswater,drainandelectrical.
Atthistime,itshouldbeveriedthatthepropertypesof
servicesareactuallyprovidedtotheunit.Onthoseunits
requiringchilledwaterand/orhotwater,theproperline
sizeandwatertemperatureshouldbeavailabletotheunit.
Inthecaseofrefrigerantcooling,theproperlinesize
andrefrigeranttypeshouldbeavailabletotheunit.On
unitswithsteam-heatingcoils,theproperlinesizing
androutingshouldbeveried,andthemaximumsteam
pressureappliedtotheunitshouldneverexceed10psig.
Thedrainpipingandsteamtrapshouldbesizedand
routedtoallowforpropercondensateow.
Theelectricalservicetotheunitshouldbecomparedto
theunitnameplatetoverifycompatibility.Theroutingand
sizingofallpiping,andthetypeandsizingofallwiring
andotherelectricalcomponentssuchascircuitbreakers,
disconnectswitches,etc.shouldbedeterminedbythe
individualjobrequirements.Verifytheelectricalconductor
sizeissuitableforthedistancetotheequipment
connectionandwillsupporttheequipmentelectricalload.
Allinstallationsshouldbemadeincompliancewithall
governingcodesandordinances.Compliance with all
codes is the responsibility of the installing contractor.
Oncertainunits,shippingscrewsorbracesmustbe
removedaftertheunitisinstalled.Besuretocheckalltags
ontheunittodeterminewhich,ifany,ofthesedevices
needtoberemoved.
Cooling/Heating Medium Connections
CAUTION: Toxic residues and loose particles
resulting from manufacturing and eld piping
techniques such as joint compounds, soldering ux, and
metal shavings may be present in the unit and the
piping system. Special consideration must be given to
system cleanliness when connecting to solar, domestic
or potable water systems.
Submittalsandproductliteraturedetailingunitoperation,
controls,andconnectionsshouldbethoroughlyreviewed

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IEC CPY 03 and is the answer not in the manual?

IEC CPY 03 Specifications

General IconGeneral
BrandIEC
ModelCPY 03
CategoryAir Conditioner
LanguageEnglish

Related product manuals