3. RESPONSIBILITY OF THE MANUFACTURER
The instructions in this manual do not replace but supplement the obligations for compliance with current legislation on
safety and accident prevention standards. With reference to what is reported in this manual, the manufacturer declines
all responsibility if:
- use of the machine contrary to the laws in force on safety and accident prevention.
- incorrect installation of the machine.
- lack of periodic and scheduled maintenance
- failure or incorrect observance of the instructions provided in the manual.
- defects in voltage and mains supply.
- unauthorized modifications to the machine.
- use of the machine by unauthorized personnel.
- use of the machine different from the labeling of fabrics
4. STORAGE AND UNPACKING
The machinery must be transported and stored in rooms where temperature and humidity do not exceed the following
values:
- TEMPERATURE: -25°C / +55°C.
- RELATIVE HUMIDITY: max 90% without condensation.
The storage of the machine in environments and methods different from those showed above can compromise the
electronic components contained within it.
It is recommended to check the machine upon receipt, taking care to report to the carrier any damage caused during
transport, both to the internal components and to the external bodywork.
The machine must be completely unpacked near the place of installation.
The packaging materials must not be dispersed in the environment and must be stored in the proper collection spaces
according to current regulations.
Remove the fixing bolts to the pallet with a wrench.
The machine must be moved, in transport from the carrier to the place of installation, by a forklift by inserting the
forklifts only and exclusively in the prepared locations.
ATTENTION!
During the handling phase, use a forklift truck that is compatible with the weights to be lifted: carefully check
the data reported in the technical sheets. Perform each movement of both moving and lifting/lowering very
slowly.
ATTENTION!
Handling by the forklift truck must be carried out only by qualified and competent personnel.
Once the installation site is reached, the machine must be completely unpacked, freeing it from packaging. Open both
side doors with the proper key and remove the fixing bolts to the pallet, visible at the base of the shoulder of the
machine.