EasyManua.ls Logo

Immergas Maior Eolo 24 4E - Page 16

Immergas Maior Eolo 24 4E
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
C82
1-27
1-28
C82
C82
1-26
5
4
1
3
2
5
6
7
8
8
10
11
9
S
A
INSTALLERUSER
MAINTENANCE TECHNICIAN
Insulated separator kit Ø80/80. Kit assembly
(Fig. 1-26): install ange (4) on the central hole of
the boiler, tting gasket (1) and tighten with the
at-tipped hex screws included in the kit. Remo-
ve the at ange present in the lateral hole with
respect to the central one (according to needs)
and replace it with the ange (3), positioning
the gasket (2) already present in the boiler and
tighten using the supplied self-threading screws.
Insert and slide cap (6) onto bend (5) from the
male side (smooth), and join bends (5) with the
male side (smooth) in the female side of ange
(3). Fit bend (11) with the male side (smooth)
into the female side of ange (4). Fit the male
end (smooth) of the intake terminal (7) up to the
stop on the female end of the bend (5), making
sure you have already inserted the wall sealing
plates (8 and 9) that ensure correct installation
between pipe and wall, then x the closing cap
(6) on the terminal (7). Join the exhaust pipe (10)
with the male side (smooth) in the female side
of the bend (11) to the end stop, ensuring that
the wall sealing plate (8) is already inserted for
correct installation between the pipe and ue.
Coupling extension pipes and elbows. To snap-
t extensions with other elements of the ue gas
extraction elements, operate as follows: engage
the concentric pipe or elbow with the male
side (smooth) on the female section (with lip
seal) up to the stop on the previously installed
element. is will ensure sealing and joining
of the elements correctly.
Insulation of separator terminal kit. Whenever
there are ue gas condensate problems in the
exhaust pipes or on the external surface of the
intake pipes, on request Immergas supplies
insulated intake-exhaust pipes. Insulation
may be necessary on the exhaust pipe, due to
excessive loss of temperature of the ue gas on
their route. Insulation may be necessary on the
intake pipe as the air entering (if very cold)
may cause the outside of the pipe to fall below
the dew point of the environmental air. e
gures (Fig. 1-27 and 1-28) illustrate dierent
applications of insulated pipes.
Insulated pipes are formed of a Ø80 internal
concentric pipe and a Ø125 external pipe with
static air space. It is not technically possible
to start with both Ø80 elbows insulated, as
clearances will not allow it. However starting
with an insulated elbow is possible by choosing
either the intake or exhaust pipe. When star-
ting with the insulated intake bend it must be
engaged on its ange until it is taken up to stop
on the ue gas exhaust ange, a situation that
takes the two intake ue gas exhaust outlets to
the same height.
Temperature loss in insulated ue ducting.
To prevent problems of ue gas condensate in
the exhaust pipe Ø80, due to ue gas cooling
through the wall, the length of the pipe must be
limited to 12 m. e gure (Fig. 1-28) illustrates
a typical insulation application in which the
intake pipe is short and the exhaust pipe is very
long (over 5 m). e entire intake pipe is in-
sulated to prevent moist air in the place where
the boiler is installed, in contact with the pipe
cooled by air entering from the outside. e
entire exhaust pipe, except the elbow leaving
the splitter is insulated to reduce heat loss from
the pipe, thus preventing the formation of ue
gas condensate.
N.B.: When installing the insulated pipes, a
section clamp with pin must be installed every
2 metres.
Conguration type B, open chamber and fan
assisted.
When using type B installation conguration
indoors, it is compulsory to install the relative up-
per cover kit along with the ue gas discharge kit.
e air intake comes directly from the area where
the boiler is installed and from the ue exhaust
in each single ue or directly from outdoors.
e boiler in this conguration, following the
assembly instructions stated in the par. 1.8 is
classied as type B.
With this conguration:
- air intake takes place directly from the envi-
ronment in which the boiler is installed and
only functions in permanently ventilated
rooms.
- e ue exhaust must be connected to its own
individual ue or channelled directly into the
external atmosphere.
- Type B open chamber boilers must not be
installed in places where commercial, artisan
or industrial activities take place, which use
products that may develop volatile vapours
or substances (e.g. acid vapours, glues, paints,
solvents, combustibles, etc.), as well as dusts
(e.g. dust deriving from the working of wood,
coal nes, cement, etc.), which may be dama-
ging for the components of the appliance and
jeopardise functioning.
On installation indoors in type B conguration
it is mandatory to install the relevant top cover
kit along with the ue gas exhaust kit.
The technical regulations in force must be
respected.
e kit includes:
N°1 - Exhaust gasket (1)
N°1 - Flange seal (2)
N°1 - Female intake ange (3)
N°1 - Female exhaust ange (4)
N°1 - Bend 90° Ø 80 (5)
N°1 - Pipe closure cap (6)
N°1 - Intake terminal Ø 80 insulated (7)
N°2 - Internal wall sealing plates (8)
N°1 - External wall sealing plate (9)
N°1 - Discharge pipe Ø 80 insulated (10)
N°1 - Concentric bend 90° Ø 80/125 (11)

Table of Contents

Other manuals for Immergas Maior Eolo 24 4E

Related product manuals