Goodrive350 series high-performance multi-function inverter  Chapter 7 
-237- 
high-frequency leakage current. 
Low cost, high sensitivity, small in volume, 
susceptible to voltage fluctuation of the grid and 
ambient temperature, weak anti-interference 
capability 
Requiring highly sensitive, accurate, and stable 
zero-phase sequence current transformer, using 
permalloy high-permeability materials, complex 
process, high cost, not susceptible to voltage 
fluctuation of the power supply and ambient 
temperature, strong anti- interference capability 
2.  Solution to RCD misoperation (handling the inverter) 
1.  Try to remove the jumper cap at "EMC/J10" on the middle casing of the inverter. 
2.  Try to reduce the carrier frequency to 1.5 kHz (P00.14=1.5). 
3.  Try to modify the modulation mode to "3PH modulation and 2PH modulation" (P8.40=0). 
3.  Solution to RCD misoperation (handling the system power distribution) 
(1)  Check and ensure that the power cable is not soaking in water. 
(2)  Check and ensure that the cables are not damaged or spliced. 
(3)  Check and ensure that no secondary grounding is performed on the neutral wire. 
(4)  Check and ensure that the main power cable terminal is in good contact with the air switch or 
contactor (all screws are tightened). 
(5)  Check 1PH powered devices, and ensure that no earth lines are used as neutral wires by these 
devices. 
(6)  Do not use shielded cables as inverter power cables and motor cables. 
7.7.5 Live device chassis 
Phenomenon 
After an inverter is started, there is sensible voltage on the chassis, and you may feel an  electric 
shock when touching the chassis. The chassis, however, is not live (or the voltage is far lower than 
the human safety voltage) when the inverter is powered on but not running. 
Solution 
1.  If there is power distribution grounding or ground stud on the site, ground the cabinet chassis of 
the drive system through the power ground or stud. 
2.  If there is no grounding on the site, you need to connect the motor chassis to the ground terminal 
PE of the inverter, and ensure that the jumper at "EMC/J10" on the middle casing of the inverter 
is shorted.