Chapter 1 Quick Start
1.1 Introduction
This chapter introduces the basic principles for UPS installation and debugging, so that customers
can install and debug UPS quickly.
1.2 Initial Checking
Perform the following checking operations prior to the UPS installation.
1. Visually examine if there is any damp, water, or damage inside and outside the UPS packing,
products and battery equipments due to the transportation. Report any such damage to the shipper
immediately.
2. Verify the product label and confirm the correctness of the equipment. The equipment label is
attached on the back of front door. The UPS model, capacity and main parameters are marked on
the label.
3. Verify correctness of the accessories. If there is any mistake for accessories, contact with shipper
or provider.
1.3 Environment Checking
Before installing UPS, please check these items as below:
1. Is the UPS operation environment temperature above 25? If so, please add cooling equipments.
Note: Environment temperature above 20, battery life will reduce to half when environment
rise each 10
.
2. Is the UPS operation environment temperature below 0? If so, please add heaters.
3. Is the UPS operation environment humidity is above 90%? Is there any condensing? If so, please
add additional protection.
4. In the UPS operation environment, is there any sunshine shining in directly or life-form coming in? If
so, please add additional protection.
5. In the UPS operation environment, is there any dust, combustible or explosive gas? If so, please
add additional protection.
1.4 Installation Checking
After finishing installation, please check these items as below:
1. Is UPS installed on the flame-retardant materials?
2. Are all cables connected exactly?
3. Are all grounded system connected according to the manual?
4. Is there enough operation space around UPS?
5. Please confirm all UPS external terminals are fastened, the moment should meet requirements.
6. Please confirm that there are no screws, cables and other conductor left in the UPS. If there is,
please take out.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the INVT HT 33030 and is the answer not in the manual?