iMars grid-tied solar inverters Installation
20
4.1 Unpacking inspection
I Inspect the information of the order and the name plate to ensure the product are the ordered one
and no damage to the package. If any problem, contact the supplier as soon as possible.
Put the inverter into the package if not used and protect it from humidity and dust.
Check as following after unpacking:
(1) Ensure no damage to the inverter unit.
(2) Ensure the operation manual, port and installation accessories in the package.
(3) Ensure no damage or loss to the items in the package.
(4) Ensure the information of the order are the same as that of the name plate.
Below are the detailed lists:
Packing list of 12kW / 15kW/ 17kW inverter:
Figure 4.1 Packing list of 12kW / 15kW/ 17kW inverter
Table 4-1 Detailed delivery list of 12kW / 15kW / 17kW inverter