EasyManua.ls Logo

IPC Eagle 1050 - Battery Version Maintenance Details; Maintenance Summary Table; Battery Version Maintenance Notes

IPC Eagle 1050
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English (Translation of original instructions)
SUMMARY TABLE
MAINTENANCE OF THE BATTERY VERSION
IMPORTANT: these operations must be carried out with the machine o and the key removed.
All routine and corrective maintenance operations must be eected by competent personnel or at an authorised service centre.
NOTE: the life of the battery strictly relates to regular periodic maintenance (checking the level and density of the electrolyte).
If the machine has not been used for a long time (for instance 4-6 weeks), it is in any case necessary to recharge the batteries to guarantee
that the voltage level never drops below the threshold value of 20.5 V.
If not used, batteries tend to lose their charge.
A : upon delivery
B : every 30 hours
C : every 50 hours
D : every 100 hours
E : every 400 hours
CHECK A B C D E
Battery liquid and voltage levels
or every 2
weeks
Check the brushes (or charcoal) of all electric mo-
tors and replace if worn
Tightness of the belts
Brake adjustment
Filter shaker
Tightness of the nuts and screws
State of the side brush
Clean the panel lter
Tightness of the bin, lter, ap gaskets
https://harrissupplyind.com - To Order Parts Call 608-268-8080

Related product manuals