Basic Operations
Copyright © ITECH Electronic Co., Ltd. 41
Then the user can configure the Phase A/B/C of three electronic loads on
master.
1. Press [Menu] to enter the system menu setting interface.
2. Select [PARALLEL SETUP] to enter the parallel setting interface.
3. Press the Up and Down key to select the “Single/Three Phase” > “A+B+C”.
4. Press [EDIT PHASE], configure the Phase A/B/C of three electronic loads,
as shown below.
5. Press [Enter] to save the setting.
After saving the settings, the user must power off the master and power on
again. The interface of master is shown as below.
Take the example of IT8628 electronic load
Select two electronic loads as the slaves.
1. Press [Menu] to enter the system menu setting interface.